Edge Operations
Edge Operations / NOC
A concept view of the market's proposed local-first edge architecture: nodes, solar/battery power, connectivity status and the synchronization queue — including a simulated internet outage with live queue drain.
Concept proposal — no edge hardware, solar installation or battery bank exists on site. Node names, power figures, battery percentages and queue contents are fictional demo values illustrating the proposed local-first architecture. Nothing here is device telemetry, durable offline storage, or real device control — the outage is a browser-side simulation.
Edge nodes (proposed)
4 local
All nodes stay online during the simulated outage
Solar / battery (demo)
68–91% reserve
Illustrative reserves across the four concept nodes
External internet
Online
Approved synchronization available
Queued records (demo)
0
Queue empty — nothing awaiting synchronization
Internet Outage Simulation
Demonstration of the proposed resilient architecture: cutting external internet does not stop market operations. Core services keep running locally while records queue for approved synchronization.
UI-only demonstration. No real network connections are affected.
Proposed Edge Nodes
Concept hardware layout with illustrative solar/battery status — no equipment is installed
- ONLINE
MarketNode Edge Core
Primary local compute: registry, IGR dashboard, sync queue
- Concept location
- Administration & Market Office (proposed room)
- Power (proposed)
- Solar-assisted supply with battery reserve (proposed)
Battery reserve 86% (demo)
- ONLINE
Gate Services Node
Gate tally capture and vehicle counting support
- Concept location
- Main Gate & Entry Plaza
- Power (proposed)
- Solar panel with battery reserve (proposed)
Battery reserve 74% (demo)
- ONLINE
Camera / Perimeter Node
On-site video analytics processing (proposed)
- Concept location
- Market-wide perimeter positions
- Power (proposed)
- Solar street-light circuit (proposed)
Battery reserve 91% (demo)
- ONLINE
Livestock Wing Node
Holding-bay movement tracking support
- Concept location
- Cattle & Camel Holding Bays
- Power (proposed)
- Shared solar array with gate node (proposed)
Battery reserve 68% (demo)
Concept proposal — no edge hardware, solar installation or battery bank exists on site.
Proposed Local Services
Services planned to run locally at the market edge
- ONLINE
Market Edge Core (NOC)
Primary local compute for market services
- ONLINE
Gate Edge Node
Gate events and vehicle counting
- ONLINE
Livestock Edge Node
Holding bay movement tracking
- ONLINE
Trader Services Edge Node
Registration and stall services
- ONLINE
Camera / Perimeter Edge Node
On-site video analytics processing
- HEALTHY
Local LAN
Market-wide local network
- HEALTHY
Local WISP
Fixed wireless link across the market
- ONLINE
External Internet
Approved synchronization and external services
- 0 pending
Sync Queue
Records awaiting approved synchronization
Statuses track the shared outage simulation used across the dashboard and Edge Operations.
Availability During the Simulated Outage
Which proposed functions keep working when external internet is cut
Remain available
Trader registry & lookup
Registration and stall lookup continue on the local network.
IGR dashboard & receipts
Revenue visibility and local receipt records continue.
AI camera analytics
Proposed edge processing continues; cloud review pauses.
Livestock & vehicle logs
Holding-bay and gate logs keep recording locally.
Local alerts & comms
On-site messaging between offices stays available.
Paused during outage
Off-site backup
Resumes when approved connectivity returns.
External AI review
Paused during the outage; proposed alerts stay queued locally.
State-level reporting sync
Queued for approved synchronization after restore.
Synchronization Queue (Demo)
Illustrative queue contents while the simulated outage is active, and the drain after restore
Gate tally events
0
Receipt records
0
Trader registry updates
0
Livestock tallies
0
AI event reviews
0
Node names, power figures, battery percentages and queue contents are fictional demo values illustrating the proposed local-first architecture. Nothing here is device telemetry, durable offline storage, or real device control — the outage is a browser-side simulation.
See the connected System Health overviewInteractive Concept Demonstration • Figures shown are illustrative demo data for concept visualization. • Concept proposal — no edge hardware, solar installation or battery bank exists on site.