Charanchi Smart Market Operations Dashboard

DEMO LIVEInteractive Concept Demonstration

Interactive Concept Demonstration. Proposed concept — not a deployed production system. Learn more

Edge Operations

Edge Operations / NOC

A concept view of the market's proposed local-first edge architecture: nodes, solar/battery power, connectivity status and the synchronization queue — including a simulated internet outage with live queue drain.

Concept proposal — no edge hardware, solar installation or battery bank exists on site. Node names, power figures, battery percentages and queue contents are fictional demo values illustrating the proposed local-first architecture. Nothing here is device telemetry, durable offline storage, or real device control — the outage is a browser-side simulation.

  • Edge nodes (proposed)

    4 local

    All nodes stay online during the simulated outage

  • Solar / battery (demo)

    68–91% reserve

    Illustrative reserves across the four concept nodes

  • External internet

    Online

    Approved synchronization available

  • Queued records (demo)

    0

    Queue empty — nothing awaiting synchronization

Internet Outage Simulation

Demonstration of the proposed resilient architecture: cutting external internet does not stop market operations. Core services keep running locally while records queue for approved synchronization.

External Internet: ONLINE

UI-only demonstration. No real network connections are affected.

Proposed Edge Nodes

Concept hardware layout with illustrative solar/battery status — no equipment is installed

Local Services Online
  • MarketNode Edge Core

    Primary local compute: registry, IGR dashboard, sync queue

    ONLINE
    Power (proposed)
    Solar-assisted supply with battery reserve (proposed)

    Battery reserve 86% (demo)

  • Gate Services Node

    Gate tally capture and vehicle counting support

    ONLINE
    Concept location
    Main Gate & Entry Plaza
    Power (proposed)
    Solar panel with battery reserve (proposed)

    Battery reserve 74% (demo)

  • Camera / Perimeter Node

    On-site video analytics processing (proposed)

    ONLINE
    Concept location
    Market-wide perimeter positions
    Power (proposed)
    Solar street-light circuit (proposed)

    Battery reserve 91% (demo)

  • Livestock Wing Node

    Holding-bay movement tracking support

    ONLINE
    Power (proposed)
    Shared solar array with gate node (proposed)

    Battery reserve 68% (demo)

Concept proposal — no edge hardware, solar installation or battery bank exists on site.

Proposed Local Services

Services planned to run locally at the market edge

  • Market Edge Core (NOC)

    Primary local compute for market services

    ONLINE
  • Gate Edge Node

    Gate events and vehicle counting

    ONLINE
  • Livestock Edge Node

    Holding bay movement tracking

    ONLINE
  • Trader Services Edge Node

    Registration and stall services

    ONLINE
  • Camera / Perimeter Edge Node

    On-site video analytics processing

    ONLINE
  • Local LAN

    Market-wide local network

    HEALTHY
  • Local WISP

    Fixed wireless link across the market

    HEALTHY
  • External Internet

    Approved synchronization and external services

    ONLINE
  • Sync Queue

    Records awaiting approved synchronization

    0 pending

Statuses track the shared outage simulation used across the dashboard and Edge Operations.

Availability During the Simulated Outage

Which proposed functions keep working when external internet is cut

Remain available

  • Trader registry & lookup

    Registration and stall lookup continue on the local network.

  • IGR dashboard & receipts

    Revenue visibility and local receipt records continue.

  • AI camera analytics

    Proposed edge processing continues; cloud review pauses.

  • Livestock & vehicle logs

    Holding-bay and gate logs keep recording locally.

  • Local alerts & comms

    On-site messaging between offices stays available.

Paused during outage

  • Off-site backup

    Resumes when approved connectivity returns.

  • External AI review

    Paused during the outage; proposed alerts stay queued locally.

  • State-level reporting sync

    Queued for approved synchronization after restore.

Synchronization Queue (Demo)

Illustrative queue contents while the simulated outage is active, and the drain after restore

Queue empty
  • Gate tally events

    0

  • Receipt records

    0

  • Trader registry updates

    0

  • Livestock tallies

    0

  • AI event reviews

    0

Node names, power figures, battery percentages and queue contents are fictional demo values illustrating the proposed local-first architecture. Nothing here is device telemetry, durable offline storage, or real device control — the outage is a browser-side simulation.

See the connected System Health overview

Interactive Concept Demonstration • Figures shown are illustrative demo data for concept visualization. • Concept proposal — no edge hardware, solar installation or battery bank exists on site.